Catherine Creek 44 Phase 4 - Shoemaker/Kinsley

GRMW ID: 1928

Fiscal Year: 2016

Project Status:

Complete

Description

Catherine Creek 44 Phase 4 - Shoemaker/Kinsley

This Project, phase IV of Catherine Creek (CC-44) Fish Habitat and Restoration Project, located approximately 3 miles Southwest of Union, Oregon (Tax lots 04S40E 2800 700, 04S40E 2800 800, 04S40E 2800 900) seeks to restore .56 miles of Catherine Creek, through the installation of large wood structures, revegetation of degraded stream banks, and long term project protection, specifically a 15 year exclusion easement. The project is located along Catherine Creek with the Atlas Biological Significant Reach (BSR) CCCC3b1 which is identified as a high priority BSR with Tier 1 (highest priority) actions. The property was channelized and confined valley left in the early 1940’s. The existing channel is homogenous, with minimal habitat and complexity. The lack of LWM significantly limits deep pool creation and available interstitial habitat utilized by juvenile salmonids. Additionally, segmented and poorly established riparian vegetation communities contribute to high summer water temperatures. This proposal seeks funding for the construction on the lower properties of Kinsley and Shoemaker (Parcels 1, and 2). Through streamlining engineering designs, refining site plans, and landowner input this proposal is now for significantly less than was previously stated in the original proposal (September 2013). The current cost estimate for these properties is $284,762.

Project Site Locations

Development Sites

Site name Latitude/Longitude Download
Project Site 45.18415990573358/-117.82302616387399 Download KML

Contacts & Roles

Name Role Organization
Kathryn Frenyea Administrative Contact Union County Soil & Water Conservation District
Aaron Bliesner Technical Contact Union County Soil & Water Conservation District

Organizations

Organization Role
Union County Soil & Water Conservation District Sponsor
Bonneville Power Administration Funding Entity

Grants & Contracts

Organization Contract # Funding Amount
Bonneville Power Administration 72327 $284762.00

Documents

Document Type View Download
Project Proposal View Document Download Document

Metrics

Metric ID Units Work Elements Metric
1387 0.35 29. Increase Aquatic and/or Floodplain Complexity # of miles of stream with improved complexity
1387 0.19 29. Increase Aquatic and/or Floodplain Complexity # of miles of stream with improved complexity
1401 0.75 40. Install Fence # of miles of fence installed in a riparian area
1406 1.40 47. Plant Vegetation, 53. Remove Vegetation, 197. Maintain/Remove Vegetation, 198. Maintain Vegetation, 199. Remove Vegetation # of riparian miles treated
1518 8.00 47. Plant Vegetation, 53. Remove Vegetation, 197. Maintain/Remove Vegetation, 198. Maintain Vegetation, 199. Remove Vegetation, 30. Realign, Connect, and/or Create Channel, 31. Conduct Controlled Burn, 48. Practice No-till and Conservation Tillage Systems, 52. Remove Mine Tailings, 55. Erosion and Sedimentation Control, 180. Enhance Floodplain/Remove, Modify, Breach Dike, 181. Create, Restore, and/or Enhance Wetland # of acres of riparian wetland habitat treated
1519 1.40 30. Realign, Connect, and/or Create Channel, 47. Plant Vegetation, 53. Remove Vegetation, 197. Maintain/Remove Vegetation, 198. Maintain Vegetation, 199. Remove Vegetation, 52. Remove Mine Tailings, 55. Erosion and Sedimentation Control, 180. Enhance Floodplain/Remove, Modify, Breach Dike # of acres of freshwater non-wetland habitat treated
1549 0.50 40. Install Fence # of miles of left streambank fenced in a freshwater area
1551 0.60 40. Install Fence # of miles of right streambank fenced in a freshwater area
1593 3.00 29. Increase Aquatic and/or Floodplain Complexity # of unanchored individual log structures (not logjams) installed for both stabilization and complexity
1595 10.00 29. Increase Aquatic and/or Floodplain Complexity # of logjam structures installed for both stabilization and complexity
1595 3.00 29. Increase Aquatic and/or Floodplain Complexity # of logjam structures installed for both stabilization and complexity
1596 19.00 29. Increase Aquatic and/or Floodplain Complexity # of unanchored rocks/boulder structures installed for both stabilization and complexity
1596 19.00 29. Increase Aquatic and/or Floodplain Complexity # of unanchored rocks/boulder structures installed for both stabilization and complexity
1603 25.00 29. Increase Aquatic and/or Floodplain Complexity # of rootwad structures installed for both stabilization and complexity
1743 35.00 40. Install Fence Average buffer width
1748 3.00 29. Increase Aquatic and/or Floodplain Complexity # of pools created for only complexity
1748 11.00 29. Increase Aquatic and/or Floodplain Complexity # of pools created for only complexity
1754 0.16 30. Realign, Connect, and/or Create Channel # of miles of side channel created in the freshwater non-tidal zone
1760 8.00 40. Install Fence # of acres of riparian non-wetland habitat protected by fencing
1624 1.00 40. Install Fence # of water gaps
1697 2.00 180. Enhance Floodplain/Remove, Modify, Breach Dike # of acres of freshwater non-tidal habitat restored/re-established