Wallowa River 6 Ranch Habitat Restoration Phase II

  • GRMW ID: 1861
  • Fiscal Year: 2014

Much of the Wallowa River below Enterprise, Oregon has been moved, straightened & channelized to accommodate agriculture, the railroad and Highway 82. In cooperation with the landowner the GRMW intends to restore 2000 feet of river channel over a 2,600 foot reach of the Wallowa River. A variety of improvements will be implemented including installation of large woody debris and habitat structures, fish rocks, bio-engineered stream banks, riparian planting, side channel construction and channel re-meandering. These improvements will benefit fish habitat, channel form and function, channel and floodplain interaction and riparian condition. At completion the project area will be strategically managed with domestic livestock utilization to promote project objectives.

Documents

Document
Project Proposal View

Contacts & Roles

Name Role Organization
Coby Menton Technical Contact Grande Ronde Model Watershed

Organizations

Organization Role
Bonneville Power Administration Funding Entity
Grande Ronde Model Watershed Sponsor
Oregon Watershed Enhancement Board Funding Entity

Grants & Contracts

Organization Contract # Funding Amount
Bonneville Power Administration 64942 $300,000.00
Oregon Watershed Enhancement Board $181,100.00
Grande Ronde Model Watershed $40,000.00

Project Points

Site Description Latitude/Longitude Link to KML
General Project Vicinity 45.4415384062 / -117.345394005 Download KML